Show simple item record

dc.contributor.authorZimmermann, Olaf
dc.date.accessioned2023-06-19T09:44:28Z
dc.date.available2023-06-19T09:44:28Z
dc.date.issued2023
dc.identifier.urihttps://library.oapen.org/handle/20.500.12657/63456
dc.description.abstractModern production systems have become more flexible and agile. For them, a suitable control and planning method is needed. Agent-based systems offer the required characteristics. The contributions of these work are a remodeling of the Shifting Bottleneck heuristic to include limited buffers, the development of a decentralized multi-agent system for production planning, and the adaptation of the heuristic to the agent system. It concludes with evaluations of real-world production systems.en_US
dc.languageEnglishen_US
dc.relation.ispartofseriesWissenschaftliche Berichte des Instituts für Fördertechnik und Logistiksysteme des Karlsruher Instituts für Technologieen_US
dc.subject.classificationthema EDItEUR::T Technology, Engineering, Agriculture, Industrial processes::TG Mechanical engineering and materialsen_US
dc.subject.otherProduktionsplanung; Dezentral; Limitierte Puffer; Ablaufplanung; Multi-Agenten-System; Production Planning; Decentral; Limited Buffer; Scheduling; Multi-Agent Systemen_US
dc.titleDecentralized Scheduling of Discrete Production Systems with Limited Buffersen_US
dc.typebook
oapen.identifier.doi10.5445/KSP/1000157036en_US
oapen.relation.isPublishedBy44e29711-8d53-496b-85cc-3d10c9469be9en_US
oapen.series.number35en_US
oapen.pages208en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record